Time lapse: construction of sludge treatment reedbed basins

by

From ARM Ltd comes this innovative use of video to show the stages of construction of a reedbed basin.

The camera, set in a fixed position, recorded a ‘time lapse’ over several weeks while contractors CA Blackwell constructed this reedbed, one of 16 built for Essex and Suffolk Water.

ARM Group Ltd carried out the design, which is the first time a reedbed has been used for drinking water sludge treatment. Covering 6 ha, the reedbed dewaters the sludge produced during the drinking water treatment process.

(c) ARM Group Ltd 2013 // www.armgroupltd.co.uk

Advertisements

Tags: ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s


%d bloggers like this: